{"id":7969,"date":"2024-10-06T06:51:28","date_gmt":"2024-10-06T06:51:28","guid":{"rendered":"https:\/\/inter-power.eu\/projects\/6-kw-hibridna-fotovoltaichna-sistema"},"modified":"2024-10-21T10:55:38","modified_gmt":"2024-10-21T10:55:38","slug":"6-kw-hibridna-fotovoltaichna-sistema","status":"publish","type":"projects","link":"https:\/\/inter-power.eu\/en\/projects\/6-kw-hibridna-fotovoltaichna-sistema","title":{"rendered":"6 kW hybrid photovoltaic system -  Draganovtsi, Gabrovo"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">We are pleased to announce the successful completion of a project for the installation of a <strong>6 kW hybrid single-phase photovoltaic system<\/strong> with a <strong>10 kWh battery<\/strong> in. Draganovtsi, Gabrovo. The project was implemented within the <strong>European Programme Procedure BG-RRP-4.026 - Support for renewable energy for households<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The system provides reliable and efficient electricity generation for the household, tailored to the customer's needs for a stable and sustainable energy supply.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With the addition of a 10 kW battery, the household can store the energy produced and use it during periods of low sunshine or increased consumption, significantly increasing energy independence.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project was funded under the Renewable Energy Support Programme, which provides an opportunity to implement innovative solutions for households and reduce energy costs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This system will contribute significantly to household sustainability and energy efficiency, while reducing dependence on traditional energy sources and electricity costs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Thank you for trusting us!<\/em><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Inter Power Ltd - Because you deserve more.<\/em><\/strong><\/p>\n","protected":false},"featured_media":7894,"template":"","projects-category":[26],"class_list":["post-7969","projects","type-projects","status-publish","has-post-thumbnail","hentry","projects-category-photovoltaic"],"acf":[],"_links":{"self":[{"href":"https:\/\/inter-power.eu\/en\/wp-json\/wp\/v2\/projects\/7969","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/inter-power.eu\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/inter-power.eu\/en\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/inter-power.eu\/en\/wp-json\/wp\/v2\/media\/7894"}],"wp:attachment":[{"href":"https:\/\/inter-power.eu\/en\/wp-json\/wp\/v2\/media?parent=7969"}],"wp:term":[{"taxonomy":"projects-category","embeddable":true,"href":"https:\/\/inter-power.eu\/en\/wp-json\/wp\/v2\/projects-category?post=7969"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}